We completely understand why this homeowner wanted to remodel this bathroom.
Originally, the bathroom walls were covered in a plastic coated contact paper.
It was replaced with wainscoting and updated wallpaper. The flooring was
indoor/outdoor carpet, which was replaced with hardwood. The sink was set
3 feet in front of the toilet. To make more room, the sink was moved back
into an adjoining closet. The cast iron bathtub was replaced with a tub
and shower surround.
_____________________________
This homeowner wanted a
concrete sidewalk to flow around the landscaping.
South East Total Service also replaced the driveway landing.
_____________________________
A local business owner needed to
add a bathroom in a commercial property.
|
|
|
Installed new drain line.
|
|
|
|
Existing space.
|
|
|
|
New dividing wall.
|
|
|
|
|
|
Added wainscotting.
|
|
|
|
|
Reset Fixtures.
|
|
|
|
Flooring and Hanicap Rail
|
|
|
|
Water heater and storage behind bi-fold doors.
|
|
|
|
Value is in the details.
|
|
|
|
Framed picture to disguise the electrical box.
|
|
|
|
_____________________________
Recently completed concrete slab
for a commercial cooler.
|
|
|
Concrete form, stone fill, and rebar. A floor drain has been piped in as well.
|
|
|
|
Poured and cured concrete inside form.
|
|
|
|
Removing the form and finishing.
|
|
|
|
Finished concrete slab and blacktop patches.
|
|
|
|
We are proud of our work.
|
|
|
_____________________________
This homeowner had reoccurring
drain problems. It was discovered that the system was back pitched
toward the house. The re-pipe project corrected the problem.
|
|
|
Existing drain system at a residential property.
|
|
|
|
|
|
New drain system in crawl space.
|
|
|
|
|
The location of the new system creates extra storage room in this crawl space.
|
|
|
_____________________________
Originally, this room was a
laundry room. South East Total Service relocated the washer and dryer,
installed a whirlpool tub, laid the tile, reset the fixtures and painted to
the customer's specifications.
|
|
|
Water supply for the whirlpool tub.
|
|
|
|
Preparing the frame for tile.
|
|
|
|
Tile and grout process.
|
|
|
|
Set all the fixtures.
|
|
|
|
Just needs a final rinse.
|
|
|
|
Re-hung the existing mirror and light fixture.
|
|
|
|
Even layed tile into the closet.
|
|
|
_________________________________
A water leak caused damaged to the sub floor in this home. After the leak
was repaired, the weakened sub floor needed to be replaced.
|
|
|
Replace Water Damaged Subfloor
|
|
|
|
|
|
|
|